Hart DC refused this outline application on 7 grounds including the fact that the site was located in one of the Strategic Gaps and the Blackwater Gap protected by policies CON19 and CON20 of the Local Plan. Following a 6 day inquiry the Inspector allowed the appeal. James Maurici QC acted for the appellant Wellbeck Strategic Land LLP.