Home > Inquiries > Sizewell C

14 September – 5 October 2021

Graeme represented Northumbrian Water Limited (t/a Essex and Suffolk Water) at the Development Consent Order Examination for the proposed new nuclear power station at Sizewell C in Suffolk, in relation to the Issue Specific Hearings dealing with water supply to the power station during the construction and operational phases.

icon-accordion-chevron icon-arrow-left icon-arrow-right icon-chevron-down icon-chevron-left icon-cross icon-download icon-letter icon-linked-in icon-phone-outline icon-phone icon-search icon-search icon-select-chevron icon-top-right-corner icon-twitter