Inquiry

Land at Thornhill Road, Keypoint Industrial Estate, South Marston, Swindon

  1. Energy from waste plant with capacity to treat 150,000tpa of residual waste, primarily commercial and industrial, using a gasification process and producing some 14.5MW of electricity and up to 1.5MW of heat – James appeared for Swindon Borough Council.

Download your shortlist

Download All Download icon